Below are instructions for cleaning a fill probe on an M58 / V2B. This is useful if the steam boiler looses pressure quickly from scale build. Before doing this we recommend unplugging the machine and allowing it to fully cool off. Tools required:
- adjustable wrench
- wire brush
First, remove panels.
Reassemble the machine, draw 4 oz of water out of the steam boiler, allow it to reheat and test for pressure retention.
Comments
0 comments
Please sign in to leave a comment.